Will James Cook be the First Touchdown Scorer of Kansas City Chiefs vs. Buffalo Bills on November 26, 2026?
Railbird Exchange, LLC · received by the CFTC 30 October 2026 · the filing (PDF)
Warrant Check read 6 operative provisions in this filing. Across them, 26 of 36 checks are present, 6 partial and 3 absent. 3 provisions have every check present. 1 rule on who may trade is not a settlement term and is left out.
26 present6 partial3 absent1 not assessedThe payout rule here is “Payout Criterion / Settlement Determination”: the rule that says what makes the contract pay Yes or No. The other 5 rules are fallback rules: what happens if the event is cancelled or delayed, the data goes missing, or the result is challenged.
| Topic the staff letters raise | Payout rule | Fallback rules |
|---|---|---|
| Settlement source identified | Addressed | 2 of 5 addressed |
| Settlement method described | Addressed | 2 of 5 addressed |
| Covers every case it applies to | Addressed | 4 of 5 addressed |
| Timing set | Addressed | 4 of 5 addressed |
| Terms in the public filing | In the filing | 4 of 5 in the filing |
What the wording addresses
- Payout Criterion / Settlement Determination — every check present.
“The Contract resolves YES if [entity] earns [achievement]” - Participation Determination: Defined Benchmark, Conclusive Link, Comprehensive Coverage, Relevant Timeline.
“[entity] has Participated if [entity] played in at least one” - Unconditionally Determined / Near-Complete Threshold Contingency: Defined Benchmark, Conclusive Link, Comprehensive Coverage, Relevant Timeline.
“Interrupted and does not Conclude within the Completion Window” - Mutually Exclusive Contracts Settlement Allocation — every check present.
“The aggregate payout across all Contracts in a Mutually Exclusive Set” - Position Accountability Level Reporting — every check present.
“A Member who holds or controls aggregate positions at or above”
What the wording leaves open
- Participation Determination “[entity] has Participated if [entity] played in at least one”
- Independent Verification — Partial: Relies on snap count data from an unnamed 'data provider vetted and designated by the Exchange' - source exists but is not identified, and Exchange retains discretion over exceptions
- Suitable Method — Partial: Snap-count data can establish participation, but the clause admits the method may leave 'data gaps' requiring discretionary resolution rather than confirmed data
- Market Outcome Review Process (erroneous/missing/unclear results) “the matter is referred to the Market Outcome Review Process”
- Independent Verification — Absent: Trigger is the Exchange's own determination that a result is 'clearly erroneous' - no named independent evidence or verification procedure
- Suitable Method — Absent: No described procedure exists in the supplied text for how 'clearly erroneous' is established; Rule 7.1 content is not provided
- Defined Benchmark — Absent: 'Clearly erroneous' is not defined by any named threshold or spec
- Comprehensive Coverage — Partial: Review appears to cover the single event's result but mechanics of scope (which data, which disputes) are not detailed
- Relevant Timeline — Partial: A 48-hour reporting window is named for one trigger, but the overall review process timing is otherwise undefined
- Relies on material referred to but not in the public filing.
- Unconditionally Determined / Near-Complete Threshold Contingency “Interrupted and does not Conclude within the Completion Window”
- Independent Verification — Partial: Evidence is 'the game state at interruption as recognized by the governing body' - plausible neutral source but recognition mechanism not specified
- Suitable Method — Partial: Determining that 'no possible continuation' could change the outcome is a logical/certainty judgment not reducible to a simple objective check
Every provision read
Payout Criterion / Settlement Determination
“The Contract resolves YES if [entity] earns [achievement]”
Determination: James Cook earned the First Touchdown Scorer achievement, officially confirmed by the Source Agency's Official Result · Consequence: Contract resolves YES (Settlement Value paid to longs) or NO (paid to shorts)
Participation Determination
“[entity] has Participated if [entity] played in at least one”
Determination: James Cook Participated in the event (played at least one snap) · Consequence: If not Participated, Contract resolves to last fair market price instead of normal binary settlement
Market Outcome Review Process (erroneous/missing/unclear results)
“the matter is referred to the Market Outcome Review Process”
Determination: A reported result is 'clearly erroneous,' unreported within 48 hours, or otherwise requires review · Consequence: Exchange determines payouts, potentially resolving to last fair market price, via Rule 7.1 process
Unconditionally Determined / Near-Complete Threshold Contingency
“Interrupted and does not Conclude within the Completion Window”
Determination: The game state meets the Near-Complete Threshold or is otherwise Unconditionally Determined · Consequence: Contract is deemed complete and settles on the Official Result or game state at interruption
Mutually Exclusive Contracts Settlement Allocation
“The aggregate payout across all Contracts in a Mutually Exclusive Set”
Determination: Settlement values across linked contracts must sum to the Contract Size · Consequence: Remaining contracts' payouts are adjusted so aggregate equals Contract Size
Position Accountability Level Reporting
“A Member who holds or controls aggregate positions at or above”
Determination: A Member's aggregate position is at or above the Position Accountability Level · Consequence: Member must provide position/strategy/hedging information and consents to Exchange instruction restricting position changes
Read 3 November 2026 with Warrant Check (instrument 1.0). Labels: Present, Partial, Absent describe whether each check is found in the wording as written. Not assessed: Conclusive Link cannot be judged where no Defined Benchmark is named; that follows from the missing benchmark and is not a separate gap.
Drafting a certification?
Have the draft read through the same lens before it is filed: privately, with nothing published. You get what the wording addresses and what it leaves open, term by term, including the fallback rules for cancellation, delay, missing data and challenged results, where gaps most often sit.