Will Patrick Mahomes and Josh Allen record a combined total of above 550.5 passing yards on November 26, 2026?
Railbird Exchange, LLC · received by the CFTC 30 October 2026 · the filing (PDF)
Warrant Check read 11 operative provisions in this filing. Across them, 50 of 66 checks are present, 8 partial and 6 absent. 4 provisions have every check present. 1 rule on who may trade is not a settlement term and is left out.
50 present8 partial6 absent2 not assessedThe payout rule here is “Payout Criterion (YES/NO determination)”: the rule that says what makes the contract pay Yes or No. The other 10 rules are fallback rules: what happens if the event is cancelled or delayed, the data goes missing, or the result is challenged.
| Topic the staff letters raise | Payout rule | Fallback rules |
|---|---|---|
| Settlement source identified | Addressed | 7 of 10 addressed |
| Settlement method described | Addressed | 6 of 10 addressed |
| Covers every case it applies to | Addressed | 8 of 10 addressed |
| Timing set | Addressed | 7 of 10 addressed |
| Terms in the public filing | In the filing | 5 of 10 in the filing |
What the wording addresses
- Payout Criterion (YES/NO determination) — every check present.
“The Contract resolves YES if the observed value” - Source Agency / Official Result determination: Independent Verification, Suitable Method, Conclusive Link, Comprehensive Coverage, Relevant Timeline.
“the final (non - live, non - provisional) result” - Source Agency non-report within 48 hours: Independent Verification, Suitable Method, Defined Benchmark, Conclusive Link, Comprehensive Coverage, Relevant Timeline.
“does not report the relevant result within 48 hours” - Participation determination: Defined Benchmark, Conclusive Link, Comprehensive Coverage, Relevant Timeline.
“played in at least one offensive, defensive, or special” - Unconditionally Determined early settlement — every check present.
“can be determined with certainty regardless of any further” - Mutually Exclusive Contracts aggregate payout: Independent Verification, Suitable Method, Defined Benchmark, Conclusive Link, Comprehensive Coverage.
“aggregate payout across all Contracts in a Mutually Exclusive” - Statistic Corrected After Conclusion — every check present.
“governing body corrects or revises the Official Statistics after” - Venue Changed to Competing Team's Home Venue — every check present.
“The game is moved to the home venue of the opposing team” - Position Accountability Level: Independent Verification, Suitable Method, Defined Benchmark, Conclusive Link, Comprehensive Coverage, Relevant Timeline.
“exceed the applicable position limit on an intraday”
What the wording leaves open
- Source Agency / Official Result determination “the final (non - live, non - provisional) result”
- Defined Benchmark — Partial: 'final (non-live, non-provisional)' is named but not further defined (no certification timestamp or process)
- Clearly erroneous result referral “the Exchange determines that a reported result is clearly erroneous”
- Independent Verification — Absent: Rests on the Exchange's own subjective determination of 'clearly erroneous' with no named objective test
- Suitable Method — Absent: No procedure specified for establishing erroneousness; purely discretionary judgment
- Defined Benchmark — Absent: No threshold or criteria defining 'clearly erroneous' is given
- Comprehensive Coverage — Partial: Presumably the specific disputed result, but not stated with precision
- Relevant Timeline — Partial: No timeframe given for when this determination must be made
- Relies on material referred to but not in the public filing.
- Source Agency non-report within 48 hours “does not report the relevant result within 48 hours”
- Relies on material referred to but not in the public filing.
- Participation determination “played in at least one offensive, defensive, or special”
- Independent Verification — Partial: Snap count data from an Exchange-vetted provider is named, but Exchange also 'owns and applies the logic' for exceptions/data gaps, reducing neutrality
- Suitable Method — Partial: Data can establish typical participation, but gap-resolution relies on Exchange discretion rather than an independent procedure
- No Data Record scenario -> Market Outcome Review “the player appears in [event] but records no entry”
- Independent Verification — Absent: Resolution is discretionary ('may be made') with the underlying Rule 7.1 process not included in the text
- Suitable Method — Absent: Undefined procedure; cannot assess whether it can establish Participation at the needed certainty
- Defined Benchmark — Absent: No standard specified for how ambiguity is resolved
- Comprehensive Coverage — Partial: Presumably limited to the ambiguous player/game but not stated precisely
- Relevant Timeline — Partial: No timeframe specified for completing this review
- Relies on material referred to but not in the public filing.
- Mutually Exclusive Contracts aggregate payout “aggregate payout across all Contracts in a Mutually Exclusive”
- Relevant Timeline — Partial: No explicit timing/order mechanics for adjustment when components settle at different times (e.g., via early Unconditional Determination)
- Relies on material referred to but not in the public filing.
- Position Accountability Level “exceed the applicable position limit on an intraday”
- Relies on material referred to but not in the public filing.
Every provision read
Payout Criterion (YES/NO determination)
“The Contract resolves YES if the observed value”
Determination: combined passing yards of the two named players exceed 550.5 per Official Statistics · Consequence: Contract resolves YES (payout to longs) or NO (payout to shorts)
Source Agency / Official Result determination
“the final (non - live, non - provisional) result”
Determination: the NFL's reported game result/statistics are the final, non-provisional Official Result · Consequence: this Official Result/Official Statistics is used to determine the Expiration Value
Clearly erroneous result referral
“the Exchange determines that a reported result is clearly erroneous”
Determination: a reported result is 'clearly erroneous' · Consequence: matter is referred to the Market Outcome Review Process under Rule 7.1
Source Agency non-report within 48 hours
“does not report the relevant result within 48 hours”
Determination: the Source Agency has failed to report the result within 48 hours of Conclusion · Consequence: Contract is referred to Market Outcome Review Process and may resolve to last fair market price
Participation determination
“played in at least one offensive, defensive, or special”
Determination: a named player 'Participated' based on snap count data · Consequence: if not participated, Contract resolves to last fair market price; if participated, normal settlement applies
No Data Record scenario -> Market Outcome Review
“the player appears in [event] but records no entry”
Determination: available data is insufficient to determine whether a player Participated · Consequence: determination of Participation and settlement may be made via Market Outcome Review Process under Rule 7.1
Unconditionally Determined early settlement
“can be determined with certainty regardless of any further”
Determination: the outcome is mathematically certain and cannot change regardless of further play · Consequence: Contract settles immediately on that determination, before Expiration
Mutually Exclusive Contracts aggregate payout
“aggregate payout across all Contracts in a Mutually Exclusive”
Determination: the set of linked Contracts' payouts sum to the Contract Size · Consequence: remaining Contracts' payouts are adjusted to make the aggregate equal the Contract Size
Statistic Corrected After Conclusion
“governing body corrects or revises the Official Statistics after”
Determination: the NFL corrects/revises Official Statistics before Expiration · Consequence: settlement uses corrected statistics; post-Expiration corrections are disregarded
Venue Changed to Competing Team's Home Venue
“The game is moved to the home venue of the opposing team”
Determination: the game is relocated to the opposing team's home venue · Consequence: Contract resolves to last fair market price instead of statistical settlement
Position Accountability Level
“exceed the applicable position limit on an intraday”
Determination: a Member holds/controls aggregate positions at or above 125,000 contracts · Consequence: Member must provide position/strategy information and consents to Exchange instruction limiting position changes
Read 3 November 2026 with Warrant Check (instrument 1.0). Labels: Present, Partial, Absent describe whether each check is found in the wording as written. Not assessed: Conclusive Link cannot be judged where no Defined Benchmark is named; that follows from the missing benchmark and is not a separate gap.
Drafting a certification?
Have the draft read through the same lens before it is filed: privately, with nothing published. You get what the wording addresses and what it leaves open, term by term, including the fallback rules for cancellation, delay, missing data and challenged results, where gaps most often sit.