Gemini Titan, LLC Product Self-Certification under 17 C.F.R. § 40.2(a) for “Will the US CPI Index be up at 5 PM ET on November 3, 2026 compared to 5 PM ET on November 2, 2026?” Event Contract.
Gemini Titan, LLC · received by the CFTC 30 October 2026 · the filing (PDF)
Warrant Check read 6 operative provisions in this filing. Across them, 19 of 36 checks are present, 4 partial and 11 absent. 3 provisions have every check present.
19 present4 partial11 absent2 not assessedThe payout rule here is “Payout Criterion / Up Determination”: the rule that says what makes the contract pay Yes or No. The other 5 rules are fallback rules: what happens if the event is cancelled or delayed, the data goes missing, or the result is challenged.
| Topic the staff letters raise | Payout rule | Fallback rules |
|---|---|---|
| Settlement source identified | Addressed | 2 of 5 addressed |
| Settlement method described | Addressed | 2 of 5 addressed |
| Covers every case it applies to | Addressed | 3 of 5 addressed |
| Timing set | Addressed | 2 of 5 addressed |
| Terms in the public filing | In the filing | 2 of 5 in the filing |
What the wording addresses
- Payout Criterion / Up Determination — every check present.
“whether the Measurement Value is up from the Reference Value” - Unavailable Index Fallback: Comprehensive Coverage.
“the last valid value published by the Source Agency before that time shall be used” - Post-Measurement Correction — every check present.
“the Source Agency corrects the value published for the Measurement Time” - BLS Reschedule / Last Trading Date Adjustment — every check present.
“BLS schedules or reschedules an Official Release to a time after the Reference Time”
What the wording leaves open
- Unavailable Index Fallback “the last valid value published by the Source Agency before that time shall be used”
- Independent Verification — Partial: still a published Mecone figure, but which figure is used depends on an unstated staleness window combined with Exchange discretion beyond one hour
- Suitable Method — Partial: a prior published value can approximate but does not establish the value at the actual required instant
- Defined Benchmark — Partial: the 'last valid value before that time' is a procedural rule, not a quality/accuracy standard
- Conclusive Link — Partial: using an earlier value entails only an approximation of the required time's value, not equivalence
- Relevant Timeline — Absent: a one-offearlier-published figure stands in for the specific Measurement/Reference instant, which can diverge from that instant's true value
- Relies on material referred to but not in the public filing.
- Methodology Change / Discontinuation Resolution “the Contract shall resolve to the last fair price determined in the sole discretion”
- Independent Verification — Absent: rests on the Exchange's own sole discretion, not any third-party-receivable evidence
- Suitable Method — Absent: a discretionary judgment cannot establish a precise settlement value with the certainty the Payout Criterion otherwise asserts
- Defined Benchmark — Absent: no defined 'fair price' methodology, formula, or threshold is specified
- Comprehensive Coverage — Absent: no stated procedure tying the discretionary price to the specific Measurement/Reference population
- Relevant Timeline — Absent: no defined period or cutoffgoverns how the discretionary determination is made
- Relies on material referred to but not in the public filing.
- Additional Settlement Contingencies / Market Outcome Review “the Exchange has the right to determine payouts pursuant to Rule 7.1”
- Independent Verification — Absent: relies on the Exchange's own sole-discretion process, not external verifiable evidence; Rule 7.1 content is not in the supplied text
- Suitable Method — Absent: an undefined internal review process cannot be assessed as capable of establishing a precise settlement determination
- Defined Benchmark — Absent: no standard or criteria for the review process are stated in the supplied text
- Comprehensive Coverage — Absent: scope of what 'cannot be determined' triggers review is undefined in the provided text
- Relevant Timeline — Absent: no time bounds on the review process are specified here
- Relies on material referred to but not in the public filing.
Every provision read
Payout Criterion / Up Determination
“whether the Measurement Value is up from the Reference Value”
Determination: the Index value at the Measurement Time is strictly greater than its value at the Reference Time, as reported by Mecone · Consequence: the Contract resolves to Yes (payout) or No
Unavailable Index Fallback
“the last valid value published by the Source Agency before that time shall be used”
Determination: the last published value before the required time adequately represents the Index value at that time · Consequence: that stale value is used to determine the Measurement or Reference Value for settlement
Post-Measurement Correction
“the Source Agency corrects the value published for the Measurement Time”
Determination: a correction issued by Mecone within one hour after Measurement Time is the accurate value · Consequence: the corrected value is substituted and used for settlement
Methodology Change / Discontinuation Resolution
“the Contract shall resolve to the last fair price determined in the sole discretion”
Determination: the Exchange's sole discretion determination of 'last fair price' reflects what the Index/CPI would have shown · Consequence: the Contract settles at that discretionarily-determined price rather than an observed Index value
Additional Settlement Contingencies / Market Outcome Review
“the Exchange has the right to determine payouts pursuant to Rule 7.1”
Determination: the Exchange's review process correctly determines payouts when the Expiration Value cannot otherwise be determined · Consequence: the Exchange determines and imposes payout outcomes outside the standard Payout Criterion
BLS Reschedule / Last Trading Date Adjustment
“BLS schedules or reschedules an Official Release to a time after the Reference Time”
Determination: BLS has scheduled/rescheduled an Official Release into the window between Reference Time and Expiration Time · Consequence: the Last Trading Date/Time is moved to before that Official Release
Read 3 November 2026 with Warrant Check (instrument 1.0). Labels: Present, Partial, Absent describe whether each check is found in the wording as written. Not assessed: Conclusive Link cannot be judged where no Defined Benchmark is named; that follows from the missing benchmark and is not a separate gap.
Drafting a certification?
Have the draft read through the same lens before it is filed: privately, with nothing published. You get what the wording addresses and what it leaves open, term by term, including the fallback rules for cancellation, delay, missing data and challenged results, where gaps most often sit.